17.06.2018

New construction of the Rhodonia residential complex in Basel

Object: Rhodonia residential development, Magnolienpark, 4052 Basel
Client: Rhodonia AG c/o Vischer AG
Architect: Carabelli Architekten AG
Window and facade construction: Gerber-Vogt AG
Project duration: 2016 to 2018
Pictures: Johannes Marburg

Finish: stain - in matte effect E6|
Process: Sanodal® BWB-Bausilber 1 (formerly BWB-Bausilber 6)
Surface finishing of windows, box-type windows, aluminum frames, entrance area

#Architecture #Northwestern Switzerland #Sanodal 

Warm surface finishing of windows, box-type windows, aluminium frames and entrance area

Some key points about the object:

  • 250 high-quality apartments amidst the greenery of the exclusive Gellert quarter
  • new housing estate: sustainably designed, home in tune with the environment
  • Facade of exposed concrete in warm coordination with anodised aluminium window fronts
  • Lift and slide anodised aluminium doors
  • Entrance area with anodised aluminium mailboxes, -bell system and -parcel boxes
  • The development impresses with its optimally utilized living space, high quality of living and low energy values.

"The Rhodonia project ran over several months and was implemented in individual stages. Keeping track of things like that is not always easy. The BWB Group knows how to coordinate partial deliveries, and production was optimally coordinated with our project stages." - Technical Purchasing, Gerber-Vogt AG


More architecture references

Discover more articles and references about our current projects and services.