17.08.2017

Schoolhouse Grounds Muttenz

Object: Schoolhouse Gründen, Gartenstrasse 60, 4132 Muttenz
Client: Municipality of Muttenz
Architect: Nord GmbH Architekten BSA SIS, Basel
Construction management: Büro für Bauökonomie AG
Window and facade construction: Gerber-Vogt AG
Project duration: 2016 - 2017
Pictures: Johannes Marburg

BWB finish: sanding & brushing - elegant structure E4
BWB procedure: BWB-Colinal 3115

#Architecture #Colinal #Northwestern Switzerland 

    Some key points about the new school building reasons:

    • New three-story primary school building with two gymnasiums in the basement and bright classrooms on the upper floor
    • Outer shell made of high quality Italian travertine
    • Finely coordinated materialization: walls made of exposed concrete, windows framed in anodised aluminium in a light Colinal shade
    • Circumferential window bands made of anodised aluminium
    • Longitudinal facade divided into three attached box windows
    • The building is a combination of classic and modern, symmetries characterize both the outer shell and the room layout inside.
    • Staircases are at the same time atriums

    More architecture references

    Discover more articles and references about our current projects and services.