BWB presents itself at the Karrierestart fair in Dresden
Nehlsen-BWB Flugzeug-Galvanik will be taking part from 19.01. to 21.01.2024 at the Karrierestart trade fair in Dresden. As a trainer of surface coaters, BWB plays a crucial role in the aviation industry's value chain.
Discover more articles and references about our current projects and services.
#News
Summer review: Team spirit during the vacation season
The vacation season is usually a challenge for small businesses. This summer, the BWB team in Rudolfstetten proved to be ultra-flexible and highly motivated under these circumstances.
#News
Out and about in white socks
BWB was also out and about during the summer: a striking number of employees and their loved ones were spotted wearing trendy tennis socks and captured in photographs. The highlights are now available as an exclusive picture gallery.
#News
How do we stay young and attractive?
How do we remain an attractive employer for prospective and existing specialists? How do we build a bridge between experienced and young employees?
#News
Anodised gold medal for all
The showdown between the Architecture and Industry divisions of BWB-Altenrhein was decided last Friday: In the football match, the Architecture team won with a final score of 4 : 2.
#News
ILA Berlin Air Show 2024
Meet the aerospace experts at the ILA Berlin Air Show 2024. From June 5 - 9, 2024, you will find BWB at the joint stand of the Free State of Saxony.
#News
BWB presents Permalux in Munich
BWB is presenting the elegant Permalux range at the architect@work trade fair in Munich. Permalux stands for outstanding durability and aesthetic excellence and is used in a wide range of applications from façades to specialized industrial applications.
#Medical technology
Electropolishing of the highest purity
In Rudolfstetten, BWB now has a production line of the highest purity in which all treatment steps are reserved exclusively for electropolishing.
#News
Step by step towards decarbonisation
BWB-Betschart AG uses its entire roof surface and part of the south façade to generate solar power. The photovoltaic system has been in operation since the end of January and generates an average of 300 megawatt hours per year.